201.5 Structures & Equipment Moving |
The Cooperative, where practicable and
upon request, will raise or lower lines to afford safe passage for
structures or equipment being moved. Parties making such requests will
be required to pay the total costs of the work performed. The parties
will be required to make an advance deposit of the total estimated
costs. The Cooperative will perform a final accounting of the costs, and
either bill or refund the difference between the actual and estimated
costs.