1.
Primary Extensions: When necessary, the Cooperative will
furnish and install single phase or multiphase overhead primary
distribution facilities to provide service where the distance is too
great for secondary service. The owner, member, or developer shall pay a
CIAC for the overhead primary distribution line extension at the per
foot charge listed on the Schedule of Charges.
2.
Secondary Extensions: The Cooperative will furnish and
install a single phase or multiphase overhead secondary service to the
normal point of delivery after satisfactory arrangements have been made
to pay the CIAC as listed on the Schedule of Charges. The normal point
of delivery for overhead service will be on the outside wall of the end
of the building nearest to the source of the Cooperative’s facilities
entering the member’s premises or at a location designated by the
Cooperative.
The Cooperative will provide secondary service to a location
other than the normal point of delivery. The costs for additional poles
and excess per-foot conductor charges are included on the Schedule of
Charges. These charges are in addition to any other charges required by
the
SRR.