Helpful Tips - New Construction Rules & Regulations
201.4 Overhead Facility Relocation |
The Cooperative, upon the request of a property owner, member, or
developer, will consider relocating existing overhead facilities. Any
relocation of facilities will be analyzed with a view to better the
Cooperative’s system and to not cause the Cooperative future problems.
Betterment of the electric system occurs when, in the sole judgment of
the Cooperative, the proposed change results in needed repair or
improvement that provides easier maintenance, repairs, replacement, or
reconstruction of the facility, and, in the sole judgment of the Cooperative, the economic return of the project justifies the investment in the
facility relocation. The owner, member, or developer making the request
for relocation will be responsible for all costs incurred that do not
result in betterment of the electric system, for obtaining all necessary
rights-of-way, and for all costs associated with cutting and clearing
the rights-of-way of vegetation or other obstructions. If the
Cooperative agrees to the relocation as requested, the party requesting
the relocation will make arrangements for payment of the total estimated
non-betterment costs before the relocation begins.
RETURN TO NEW CONSTRUCTION RULES & REGS
RETURN TO MAIN PAGE
|